沃尔玛工厂产能能力(质量管理)审核文件清单 Request Document List (for Wal-Mart FCCA) |
No. |
项目与内容 general Items |
1.0 |
工厂自我评估表 Wal-Mart Factory Pre-Audit-Audit Questionnaire |
1.1 |
工厂简介 Brief introduction of factory |
1.2 |
营业执照 Business License |
1.3 |
公司组织架构图 Organization chart |
1.4 |
(公司)厂区/厂房平面图 Plant layout plan |
1.5 |
生产工序流程图(针对WM的采购产品或类似产品) Production process flow chart(focused on WM's order or similar product) |
1.6 |
管理体系证书(质量/环保/社会责任等) Certificate of various management systems ISO9001/BRC/ISO14001/ICTI/WRAP etc |
1.7 |
利器(刀片,剪刀等)收发控制/断针控制/验针记录 Procedure and records of sharp tools control(blades, scissors)/broken needle control/metal detection |
1.8 |
仪器设备校验程序/记录和报告 Procedure and records of equipment calibration |
1.9 |
设备(在用生产机器/检验测试设备/工具及闲置仪器设备工具等)明细单 List of machines, tools, spare parts and equipment. |
1.10 |
设备维修保养记录 Maintenance and repairing records for machine/equipment. |
2.1 |
质量手册(质量方针,质量目标)/程序文件 Quality manual(quality objective, quality policy)/procedures |
2.2 |
客户投诉处理程序及记录 Procedure and records of customer complaint |
2.3 |
产品紧急事故处理程序(包括召回程序)及记录 Product recall procedure including procedure and records when applicable |
2.4 |
质量会议记录(重点关注由生产部和品管部针对解决质量问题而召开的会议)Quality meeting records(mainly focused on the meeting for solving the quality issues between production dept and quality control dept) |
2.5 |
质量管理体系/质量控制关键人员职责 Role and Responsibility of QC personnel |
2.6 |
危害分析及风险评估(物理性危害来源如:金属异物;化学性危害来源如:清洁剂,杀虫剂的使用,微生物方面的危害来源如:虫害,霉变) Hazard Analysis and Risk assessment to identify hazards from physicals/chemicals/microbiology |
2.7 |
控制物理/化学/微生物危害的程序和记录 Procedures and records about control risk of physical/chemical/microbiological contamination (which may damage the product and personnel) |
3.1 |
来料检验控制程序 Procedure of quality control on incoming materials |
3.2 |
各种来料检验标准及缺陷分类 Inspection criteria (e.g. sampling plan/AQL/defective classification) |
3.3 |
IQC来料检验报告/不良品处理(退货,挑选及让步接收等)记录 Inspection/test reports of incoming materials including rejected items and concession when applicable |
3.4 |
来料中免检产品的符合性证书或测试报告 Certificate of compliance or test report of incoming materials when applicable |
3.5 |
物料库存/周转控制的程序或规定 Procedure/rules of materials rotation control and inventory management warehouse (e.g. FIFO) |
3.6 |
供应商评审程序及记录(包括初次供应商挑选评估及后续定期的供应商表现评估) Supplier Assessment System (including initial evaluation and regular assessment) |
3.7 |
供应商来料状况的质量统计 On-going performance monitoring for incoming goods |
4.1 |
产品设计程序及记录(适合时) Procedure and records of product design when applicable |
4.2 |
(量产前进行)试产的制度记录及相应的纠正改善措施(有需要时) Pilot-run policy and records, and the corresponding corrective actions when applicable) |
4.3 |
产前会议制度及记录 Procedure/records of pre-production meeting |
4.4 |
制造各工序包括包装的作业指导书/规格要求,参考样板,批准板 Working instruction/specification/approval and reference sample for manufacturing and packing |
4.5 |
过程质量控制的程序/标准/记录(首件检验,在线检验,巡检,抽检,全检) Procedure/criteria/records of IPQC (First piece inspection, on-line inspection, patrol inspection, random inspection, full inspection etc. |
4.6 |
过程不良处理程序及记录 Non-conformity control procedures and records on WIP products |
4.7 |
过程不良的纠正预防 Corrective/preventative actions in case of bath non-conformity identified for WIP products |
5.1 |
内部测试清单/测试手册(操作指引)/测试记录 List of in-house testing/testing manual(instructions)/testing records |
5.2 |
仪器校验记录 Internal/external calibration records/reports of testing equipment |
5.3 |
测试人员资质培训记录 Training records of testing technician |
6.1 |
终期产品检验程序 Inspection procedure for final products |
6.2 |
终期检验标准 Inspection standard/inspection level/Sample Plan on final products |
6.3 |
不良成品的处理程序及记录 Non-conformity control procedures and records on final products |
6.4 |
不良成品的纠正预防 Corrective/preventative actions for non-conformity final products |
6.5 |
成品出货放行机制 Procedure of shipment release |
6.6 |
标识及可追溯性:批次标识/日期标 Identification and traceability(batch code/date code etc when applicable) |
7.1 |
培训的制度及记录(包括入职前,岗前培训,定期培训,包括普通操作员/检验员/工程技术人员) Training procedure and records (pre-work training, on-job training and regular training) for workers/QC members/technician/engineers |
7.2 |
对熟练工技术人员的招聘前的考核 Pre-hire test for skilled personnel |